OPWiK Wastewater Treatment Plant
Modernization of the pledge of two gratings with a press for removing short circuits from sewage in the Main Pumping Plant. These activities consisted of replacing the control cabinet equipped with a redundant grid control system with the possibility of selecting the optimal operating logic adapted to the current needs of the treatment plant.
Modernization of the main switchboard consisting in the replacement of power switches together with the SZR automation system, based on a PLC controller with switching and safety logic adapted to the individual needs of the power supply system of the Treatment Plant.
News and Challenges
Our improvements and the need for continuous accessibility in the engineering world
Your path to professional development
Create your own career path in electrical industry. Check out our latest job offers and join our team.